|
|
TM 55-1930-208-24
Section V. MAINTENANCE OF ENGINE
Para.
Para.
Block, Cylinder ................................ .............4-16
Cylinder Liners................................ ....... 4-12
Crankshaft and Seals................................ ...5-15
Head, Cylinder................................ ....... 4-10
Crankshaft Front Cover................................ 4-14
Main Bearings................................ ........ 4-13
Pistons and Connecting Rods................ 4-11
4-10. HEAD, CYLINDER.
This task covers:
a.
Disassembly
b. Cleaning
c.
Inspection
d. Repair
e.
Assembly
INITIAL SET-UP:
Tools Required:
Tool Kit, General Mechanics (Item 1, Appendix B)
Valve Guide Removal (Item 30, Appendix B)
Valve Seat Removal Tool (Item 31, Appendix B)
Injector Tube Installer (Item 32, Appendix B)
Injector Tube Installer Pilot (Item 33, Appendix B)
Pressure Checking Tool P/N 28454 (Item 34, Appendix B)
Injector Tube Swaging Tool P/N J28611 (Item 35, Appendix B)
Die, Flaring J5286-6 (Item 36, Appendix B)
Reamer P/N J22525-1 (Item 37, Appendix B)
Injector Tube Cutting Tool P/N J5286-8 (Item 38, Appendix B)
Injector Tube Nut Seat Reamer P/N J5286-9 (Item 39, Appendix B)
Valve Guide Installer P/N J4144 (Item 40, Appendix B)
Valve Seat Insert Installing Tool P/N J1736 (Item 41, Appendix B)
Grinder Set, Valve Seat P/N J7040 (Item 42, Appendix B)
Adapter Set, Valve Seat P/N J8165-8 (Item 43, Appendix B)
Wrench, Torque (Item 71, Appendix B)
Materials Required:
Cloth, Crocus (Item 5, Appendix C)
Compound, Sealing (Item 22, Appendix C)
Oil, Cutting (Item 6, Appendix C)
Oil, Fuel (Item 9, Appendix C)
Solution, Alkaline (Item 2, Appendix C)
Equipment Conditions:
Engine shut down (paragraph 2-11, TM 55-1930-208-10).
Cylinder head removed (paragraph 3-38).
4-16
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |