TM 55-1930-208-24
3-38. HEAD, CYLINDER
This task covers:
a. Removal
b.
Installation
INITIAL SETUP:
Tools Required:
Tool Kit, General Mechanic's (Item 1, Appendix B)
Wrench, Torque (Item 71, Appendix B)
Materials Required:
Adhesive (Item 1, Appendix C)
Compound, Sealing (Item 22, Appendix C)
Gasket P/N 5103659
Gasket P/N 519973
Equipment Conditions:
Engine shut down (paragraph 2-11, TM 55-1930-208-10).
Coolant drained (paragraph 2-17, TM 55-1930-208-10)
Exhaust manifold removed (paragraph 3-33).
Air cleaners removed (paragraph 3-18).
Inlet housing removed (paragraph 3-18).
Thermostat and housing removed (paragraph 3-28).
Water manifold removed (paragraph 3-27).
Rocker cover removed (paragraph 3-31).
Fuel injectors and fuel piping removed (paragraph 3-35).
Fuel lines removed (paragraph 3-35).
Fuel strainer removed (paragraph 3-21).
Fuel filter removed (paragraph 3-8).
Fuel injector control rack removed (paragraph 3-22).
a. Removal. (Refer to figure 3-77).
(1) Remove four lower bolts (1) and four lockwashers (2) from lifting brackets.
(2) Remove two nuts (3) and ten bolts (4).
(3) Attach a sling to the cylinder head lifting bracket and a chain hoist, lift cylinder head (5) away from the
engine.
(4) Remove and discard gasket (6) and seal rings (7).
3-134
|