|
|
TM 9-2835-255-34
GAS TURBINE POWER UNIT REPLACEMENT (Sheet 22 of 30)
CAUTION
Do not install four temporary bolts (1)
without spacers (2). Bolts may extend
beyond thread depth and become lodged
in power unit housing.
NOTE
Use four of the 45 bolts removed in step
17.b. Use four nuts (callout 14, page
module flange as spacers (2).
o.
Temporarily install four bolts (1) and spacers
(2) with the first bolt located in a bolt hole near
the end of turnbuckle rod bearing assembly
(13). Evenly space other 3 bolts 90 degrees
apart (approximately 2, 4, 8 and 10 o'clock
positions) on mechanical housing outer flange
(3). Tighten bolts securely.
p.
Remove lifting sling (4). Install seven mounting
bolts (5) in threaded holes (6) and set sling
aside.
q. Apply antiseize compound to four outer
threaded mounting flange holes (7).
r.
Install new gasket (8) over two spring pins (9)
in regenerator (10).
s.
Install turbine gearbox housing and spur gear-
shaft (11). Make sure housing is seated prop-
erly on spring pins (9) and is flush against
gasket (8) and mounting surface.
t.
Apply antiseize compound to four bolts (12).
Install four bolts (12) and tighten between
250-325 lb-in (28-37 Nm) torque.
Go on to Sheet 23
6-83
Change 6
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |