|
|
TM 9-4931-381-14&P-1
SECTION Il. OPERATION UNDER USUAL CONDITIONS
4-16. General. This section provides step-by-step instructions for setting up, checking out,
and placing the test set in operation. Operating instructions covering the use of the test set in
troubleshooting units under test of the M1 and M60A3 Tanks are not covered in this manual.
Refer to TM 9-1200-206-34- I -2 for troubleshooting the TIS and TM 9-5855-267-24 for
troubleshooting the TTS. The procedures in this section show the test set display messages that
appear when there is nothing wrong with the test set. If the test set fails the self test
operation a message telling how to correct the problem will show on the display. When this
replaceable or repairable item and determine the maintenance action required.
NOTE
Frames I through 13 in para. 4-17 are for initial preparation for operation
of the test set. Frames 14 and 15 are for preparation for operation as
part of a troubleshooting procedure.
Preparation for Operation. Frames I through 13 tell you how to set up the test set for
4-17.
operation. The steps cover case cover removal, visual inspection, cable connection, power on,
automatic self-test, and test routine selection. Refer to Operator's Manual for setup and
adjustment procedures for the external 24 V dc power supply. Frames 14 and 15 tell you how to
set up the test set for operation as part of a troubleshooting or maintenance procedure. The
steps cover cable connection, power on, and automatic self-test.
Volume 1
Para. 4-16
4-12 Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |