Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2835-255-34
GAS TURBINE POWER UNIT REPLACEMENT (Sheet 13 of 30)
INSTALLATION:
NOTE
Go to installation step No. 2 if gas turbine
power unit is unserviceable and not being
salvaged or control exchanged.
1.  CHECK REPLACEMENT GAS TURBINE POWER
UNIT (1) FOR PROPERLY INSTALLED RIGGING PIN
(2) IN SPUR GEAR (3) AND SHROUD (4).
CAUTION
Excessive rotation of spur gear (3) with
turnbuckle rod bearing (5) disconnected
may cause vanes (6) to become unhinged
from spur gear (3).
If vanes (6) become unhinged, reas-
semble gas turbine power unit (1) with
original parts and replace with a service-
able unit.
If rigging pin (2) is not installed, rotate spur
a.
gear (3) in either direction until rigging pin (2)
can be inserted through hole in spur gear (3)
and into alignment hole in shroud (4). Avoid
rotating spur gear excessively which could
cause vanes (6) to unhinge. Insert rigging pin
(2).
Check vanes (6) around circumference of gas
b.
turbine power unit (1) to ensure no vanes (6)
are dislodged or unhinged from spur gear (3).
If one or more vanes (6) become unhinged,
c.
reassemble gas turbine power unit (1) and
replace with a serviceable unit.
Go on to Sheet 14
6-74
Change 6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business