|
|
TM 9-2815-224-34&P
Engine Governor Maintenance Instructions (Cont)
15-5. THROTTLE DELAY REMOVAL/lNSTALLATION.
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
INITIAL SETUP
Models
All
TM o r Pam
Condition Description
Test Equipment
Right front engine brake
retarder and drone removed.
None
Special Tools
None
General Safety Instruct ions
Supplies
None
None
Personnel Required
Level of Maintenance
Direct Support
MOS 63W, Wheel vehicle repairer
References
None
a. Removal.
(1) Remove two nuts (1), lockwashers (2), and U-bolt (3).
(2) Remove throttle delay cylinder (4).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |