Note. The short run-in schedule is for rebuilt engines with original bearings and piston rings. In-
stall engine in combination with a dynamometer or other variable loading device and operate in ac-
cordance with the following schedule.
Gross brake
Duration
Engine speed
(minutes)
(bare engine)
Fuel
5
650-700
0
Diesel
Diesel
5
1000
15
Diesel
10
1200
15
Shut down and retorque all cylinder head nuts to 130 pound feet.
650-700
-0
Diesel
1000
15
Diesel
1200
15
Diesel
1600
33
Diesel
2000
64
Diesel
2400
110
Diesel
2600
Diesel
140
2600
(Adjust full throttle
140-145
Diesel
position and set
governor)
Power check (full
1400
92 minimum
Diesel
650-700
o
Diesel
DIESEL FUEL
------
COMPRESSION IGNITION
FUEL
--
--
- -- -- GASOLINE
TION FOR STORAGE
a. Oil Pressure. Oil pressure may be mea-
sured by removing the oil pressure sending
unit (figs. 489 and 480) from the main oil
gallery and installing an oil pressure gage.
When oil pressure cannot be maintained be-
tween 50 to 60 psi replace oil pressure regula-
tor valve spring (fig. 101). If spring replacement
does not bring oil pressure to specified limits,
check oil pressure regulator valve (par. 87)
against limits specified in repair and rebuild
standards (par. 293). Replace faulty plunger,
if necessary.
b-. Idle Speed. Must for smooth idle at
ENGINE SPEED - RPM
650 to 00 rpm by turning the idle adjusting
ORD El 8424
screw on the fuel injection pump (fig. 56).
Turn the screw clockwise to increase idle
speed and counterclockwise to decrease idle
ANCE CURVE.
speed.
330
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |