|
|
6-45.
Overhaul
of
Throttle
Control
Cross
Shaft
and
Fuel
Injection
Pump
Linkage
a. Disassembly. Disassemble throttle control
cross shaft and fuel injection pump linkage
following instructions which accompany figures
through
6-220.
Remove
1. Remove camshaft end plate bearing inner retaining
ring (A).
2. Remove cap screw (B) and lock washer (or assembled
washer bolt).
3. Remove control lever (C) from cross shaft.
4. Remove cross shaft bracket bearing retaining ring and
bracket (D) with bearing as shown in figures 6-215 and
6-216.
Remove
5. Remove cross shaft lever bearing retaining ring and
1. Place the throttle control cross shaft and fuel injection
lever (E) with two bearings as shown in figures 6-215
pump linkage (A) in a soft-jawed vise.
and 6-216.
2. Remove retaining ring (B).
Install
3. Remove ball bearing (C) as shown in figure 6-216.
1 . Install cross shaft lever (E) with bearings, and
Install
retaining ring as shown in figure 6-215.
1. Place the throttle control crow shaft and fuel injection
2 . Install cross shaft bracket (D), with bearing, and
pump linkage (A) in a soft-jawed vise.
retaining ring as shown in figure 6-215.
2. Install ball bearing (C) on cross shaft.
3. Install control lever (C) on cross shaft.
3. Install retaining ring (B).
4. Install cap screw (B) and lock washer.
5. Install camshaft end plate bearing inner retaining ring
Removing
or
installing
(A).
camshaft end plate ball bearing
Figure 6-217. Removing or installing cross
retaining
ring
and
ball
bearing.
shaft levers and bracket.
Figure
6-216.
Removing camshaft
end
plate
ball bearing.
6-181
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |