Click here to make tpub.com your Home Page

Page Title: Section X. OVERHAUL OF CAMSHAFT AND THROTTLE CONTROL CROSS SHAFT AND FUEL INJECTION PUMP LINKAGE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

and
accessory
drive
housing
stamped
numbers
Note. Before
installing
assembled
fuel
in-
jection  advance  assembly  and  fan  drive  bevel
correspond
to
their
proper
location
before
gearshaft,  check  gearshaft  backlash  and  re-shim
assembling.
as necessary (fig. 6-189). Be sure bearing cap
Figure 6-206. Installing fuel injection advance bearing cap.
S e c t i o n X. OVERHAUL OF CAMSHAFT AND THROTTLE CONTROL CROSS
SHAFT  AND  FUEL  INJECTION  PUMP  LINKAGE
6-43. General
procedures  where  applicable.  R e f e r  t o  t h e
table  (table  6-33)  for applicable
following
a. This section covers the overhaul of the
illustrations
instructions
for  overhaul
and
cam  shafts  and  throttle  control  cross  shaft  and
operations.
fuel injection pump linkage. Specific instructions
b. Overhaul of the right and left camshafts is
on disassembly, cleaning, inspection, repair, and
assembly accompany the overhaul operations.
similar.
For
instructional
purposes,
procedures
for the right camshaft will be illustrated with
Overhaul  standards  of  individual  components
references  to  the  left  camshaft  only  where
follow  the  inspection  procedures.  Stud  iden-
overhaul
procedures
vary.
tification information is included in the repair
6-173

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business