|
|
TM 746-10
d. Air motors and pneumatic drills. Preserve per
4-50. Hammer, Piledriver, Self-powered
a. Unpainted, ferrous metal surfaces. Coat all
e. Hoses. Seal ends with plastic wrap (L-P-378 or
unpainted, unprotected, ferrous metal surfaces with P-1.
equal) and tape. Coil hoses to a safe minimum
b. Cylinder and ram. Coat interior surfaces of
diameter and secure with the tape specified herein.
cylinder and ram with P-10, grade 30.
f Belts, harness, gloves, power cable, wire rope,
c. Combustion chambers.
Fog combustion
valves, and wire reels. Pack in fiberboard boxes.
chambers through the air inlet port with P-10, grade 30.
g. Galvanometer, goggles, abrasive wheels,
d. Fuel and lubricating oil tanks. Drain to the
blasting machine, and grinder. Pack in fiberboard boxes
maximum extent possible and fog interior surfaces with
and cushion items within the box with cellulosic
P-10.
cushioning.
e. Cylinder openings. Seal with plastic tape.
boxes and cushion with cellulosic cushioning. Pack in
surfaces of transmitter with P-10. Wrap or cover with
fiberboard boxes.
greaseproof barrier material and unit pack in fiberboard
boxes. Seal all openings of boxes with tape (fig 4-3).
j. Drifter drill. Preserve and pack drifter drill per
g. Hoses. Coat fittings with P-1 and coil.
above requirements. Consolidate component items
h. Other component items. Pack other component
except those that are bundled in wood, plywood, or
items in wood or plywood boxes.
triple-wall fiberboard boxes and secure to the drifter drill.
Position sinker drill on drifter drill and secure with steel
4-51. Pneumatic Tool and Compressor Outfits
strapping. Secure boom and drill on unit in a compact
a. Bits, chisels, drill rods, ripping tools, moil points,
position to reduce cube and prevent damage.
tamping pads, picks, rods, and spades. Coat with P-1.
4-53. Well-drilling Machines
Preserve and pack per paragraphs 4-51 and 4-52 for
c. Hoses. Coil and secure with tape or twine.
similar components of this chapter and as follows:
d. Goggles and inflator gauge.
Cushion with
a. Folding mast and crown block assembly. Coat
cellulosic cushioning and unit pack submethod IC-1.
unpainted surfaces including sheaves, anchor, guard,
and traveling block with P-1.
applicable paragraphs of this chapter. Place packed
b. Hoisting assembly. Coat main hoist, sand reel
and
unpacked
component
items
within
the
drums, and planetary reduction gears with P-1.
compartments
provided
on
the
compressor.
Consolidate components that cannot be accommodated
c. Mud pump. Drain fluid cylinders and valve
within the compartments in wood or plywood boxes and
chambers. Coat interior surfaces of the cylinder liners,
secure the boxes to the rear of the trailer with steel
cylinder heads, valve seats, and valve cover plates with
strapping.
P-10. Replace cylinder heads and cover plates. Cover
exposed openings through the piston rod lubricating
4-52. Rock-drilling Equipment Sets
glands with greaseproof barrier material and secure in
a. Drill rods, pickets, and tool steel. Coat with P-1.
place with tape.
Bundle items of like size and description with metallic
d. Component items.
Intermediate
pack
strapping.
component items requiring the protection of a container
b. Couplings, bushings, menders, extractors, and
in wood, plywood, or triple-wall fiberboard boxes.
bits. Coat with P-l, wrap with greaseproof barrier
4-54. Concrete Mixers, Trailer-mounted
material, secure with tape, and pack in fiberboard
a. Water-measuring tank and pump. Coat interior
boxes.
surfaces including working parts of water pump, tank,
c. Oilers, manifolds, nipples, unions, and elbows.
valves, and lines with P-10. Allow excess preservative
Coat interior surfaces of oilers and manifolds with P-10
to drain and seal 6penings with tape. Coat exterior
and seal openings with plastic tape. Pack items in
unprotected surfaces with P-1.
fiberboard boxes.
b. Mixing drum. Remove mixing drum drain plug
and position the drum with the drain at the
4-14
TM 746-10
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |