|
|
TM 55-1905-223-24-17
CHAPTER 2
UNIT MAINTENANCE INSTRUCTIONS
Page
Section I.
Repair Parts, Special Tools; Test, Measurement, and
Diagnostic Equipment (TMDE); and Support Equipment. ........................ 2-1
Section II.
Service Upon Receipt ............................................................................. 2-1
Section III.
Unit Preventive Maintenance Checks and Services (PMCS) ................... 2-10
Section IV.
Unit Maintenance Troubleshooting .......................................................... 2-17
Section V.
Unit Maintenance Procedures ................................................................. 2-44
Section VI.
Preparation for Storage or Shipment ....................................................... 2-108
SECTION I. REPAIR PARTS, SPECIAL TOOLS; TEST, MEASUREMENT AND DIAGNOSTIC EQUIPMENT
(TMDE); AND SUPPORT EQUIPMENT
2-1.
Common Tools and Equipment . For authorized common tools and equipment, refer to the Modified
Table of Organization and Equipment (MTOE) applicable to your organization.
2-2.
Special Tools, TMDE, and Support Equipment . Special tools; testing, measurement, and diagnostic
equipment; and support equipment requirements are listed and illustrated in the Repair Parts and Special Tools
List (RPSTL), TM 55-1905-223- 24P. These items are also listed in the Maintenance Allocation Chart (MAC),
2-3.
Repair Parts. Repair parts are listed and illustrated in the Repair Parts and Special Tools List (RPSTL),
TM 55-1905-223-24P.
SECTION II. SERVICE UPON RECEIPT
2-4.
Checking Unpacked Equipment.
a.
Inspect the equipment for damage incurred during shipment. If the equipment has been
damaged, report the damage in accordance with the instructions of DA Pam 738-750.
b.
Check the equipment against the packing slip to see if the shipment is complete. Report all
discrepancies in accordance with the instructions of DA Pam 738-750.
c.
Check to see whether the equipment has been modified.
2-1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |