Click here to make tpub.com your Home Page

Page Title: Section VI. PREPARATION FOR STORAGE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1905-223-24-17
Section VI. PREPARATION FOR STORAGE
2-37. Extended Shutdown or Storage. If, for any reason other than seasonal requirements, the operating
equipment in the environmental control subsystem (HVAC) is shut down for a period exceeding 1 year, the
maintenance procedures in step a. below must be performed. Maintenance procedures and requirements for
equipment startup after extended shutdown are given in step b.
a. Extended shutdown of operating equipment.
(1) Heating equipment (DH/UH/CH):
(a) Perform all Daily, Monthly, and Annual PMCS schedules (Table 2-1).
(b) Turn electrical power OFF and tag "Out of Service."
(2) Ventilation Fans (SF/EF):
(a) Perform all Daily, Monthly, Semi-Annual and Annual PMCS schedules (Table 2-1).
(b) Turn electrical power OFF and tag "Out of Service."
(3) Air Conditioners (A/C):
(a) Perform all Daily, Monthly, Bi-Monthly, Semi-Annual, and Annual PMCS schedules (Table 2-1).
(b) Turn electrical power OFF and tag "Out of Service."
b. Startup of equipment after extended shutdown/storage.
(1) Heating equipment (DH/UH/CH):
(a) Conduct pre-inspection and service (paragraph 2-9a).
(b) Start and run heater to check operation (paragraph 2-9a).
(c) Remove "Out of Service" tag from circuit.
(2) Ventilation Fans (SF/EF):
(a) Conduct pre-inspection and service (paragraph 2-9b).
(b) Start and run fan to check operation (paragraph 2-9b).
(c) Remove "Out of Service" tag from circuit.
2-108

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business