![]() TM 55-1905-223-24-17
f. Remove the mounting hardware from each steel leg (4) and remove the condenser (1).
REPLACEMENT
a. Remove temporary pipe coverings (rags) and clean the connection portion of pipes of dirt or grease.
Remove any solder build-up on connections by heating with soldering torch and wiping with clean rag.
CAUTION
Do not allow solder particles or other debris to enter piping or
condenser.
b. Align all piping connections, position condenser (1), and install mounting hardware for each steel leg (4).
(1) Refrigerant outlet line connection (6).
(2) Seawater inlet line connection (5).
(3) Seawater outlet line connection (3).
(4) Refrigerant inlet line connection (2).
d. Open external seawater inlet and outlet valves.
e. Charge system with R-22 refrigerant.
f. Operational check:
(1) Turn electrical power ON.
(2) Start and run air conditioner to check operation.
(3) Remove "Out-of-Service" tag from circuit.