|
|
TM 55-1905-223-24-17
2-5.
Deprocessing Unpacked Equipment.
a.
Remove protective caps, plugs, inserts, wrappings, and tape when inspection/inventory is
completed. Inspect piping openings for damage. Wipe off dirt, grease, or protective films at time
of installation.
b.
Remove chocks for resilient mounted components.
2-6.
Initial Setup Procedure. Includes operational checks and inspections not performed for a routine
startup. Direct support maintenance personnel will perform initial setup in accordance with the
operator's manual, TM 55-1905-223-10.
2-7.
Normal Startup. Refer to the operator's manual, TM 55-1905-223-10.
2-8.
Shutdown Procedure (Usual or Unusual). Refer to the operator's manual, TM 55-1905-223-10.
2-9.
Preliminary Servicing and Adjustment . To make sure that the HVAC equipment will be adequately
inspected, serviced, and operationally tested before it is subjected to normal everyday use, the
following pre-inspections, service, startup, and shutdown procedures must be performed. Refer to TM
55-1905-223-10 for the locations and operation of external controls and thermostats.
a.
(1)
Duct Heaters (DH).
(a)
Pre-inspection and service.
WARNING
Turn electrical power OFF to avoid personal injury.
1
Make sure all electrical power to the heater is OFF. Open terminal box door.
2
Visually check for dirt and debris in terminal box. Clean with soft bristle brush or vacuum cleaner
with non-metallic nozzle as required.
3
Check all electrical connections for looseness and secure as required. Close terminal box door.
4
Inspect supply air fan to the heater. Refer to step b. of this procedure.
5
Check supply air intakes to heater for obstructions. Correct or remove obstruction as required.
2-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |