|
|
(a) Align spades on mobilizer with shelter brackets.
(b) Insert mobilizer spades into sockets, align
locking pin holes.
(c) Insert locking pins through aligned holes. Repeat
this procedure at all four attachment points on
the shelter.
(d) Pump each dolly to raised position.
(e) Lock strut in position.
(f) Install tie cable assemblies, connecting front
tighten nuts using pump
handle.
Detachment from Shelter
To detach shelter, proceed as follows:
(a)
Set parking brake on rear dolly.
(b)
Remove tie cable assemblies.
(c)
Lower mobilizer (refer to para 4.3.2)
(d)
Detach locking pin assembly from mounting
points.
(e) Release parking brake.
(f) Push front and rear dollies down and away
from shelter to separate.
Attachment to Prime Mover
To attach mobilizer to prime mover, proceed as follows:
Attach drawbar to prime mover by placing lunette
(a)
eye of mobilizer in pintle hook of prime mover.
Lock pintle hook.
(b)
Connect electrical cable assembly from rear dolly
(c)
to prime mover.(Part No. 7400017-502 only)
(d)
Connect intervehicular air line between front and
rear dollies. (part No. 7400017-502 only)
Connect air line from front dolly to prime mover.
(e)
Make certain that air line is connected to service
(f)
line, not to emergency line of prime mover(Part No. 7400017-502 only)
(g)
Check brakes for proper operation before towing
mobilizer.
NOTE
Direct excess cable over top of payload,
allow same amount of slack in line at
both front and rear.
Check brakes are released before towing mobilizer.
Safety Precautions
The following safety precautions must be observed to avoid
accidents and injury to personnel:
(a) Set parking brake whenever mobilizer is not being
However, if mobilizer is being parked for a
towed.
prolonged period, chock wheels securely to prevent
movement and release hand brake.
This will prevent
brake freezing due to moisture and corrosion within
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |