|
|
Lowering Mobilizer
Before lowering Mobilizer, place control valve in "PUMP"
position and pump up to relieve tension on struts. Release
struts by loosening wing nut. With no load on transporter,
place control valve in maximum "RELEASE" position, with pay-
load attached to Mobilizer move control valve slowly to
"RELEASE" position which allows release of pressure. Control
speed of operation by adjusting control valve.
WARNING
With control valve in fully opened position heavy loads
will be dropped abruptly, causing possible damage to
equipment and injury to personnel.
Uncoupling Front and Rear Dollies
To uncouple front and rear dollies proceed as follows:
(a) Remove flexible air line (Part No. 7400017-502 only)
(b) Remove pump handle from storage position
and insert in pump lever.
(c) Lower mobilizer (refer to para 4.3.2)
(d) Remove Fore and Aft lock pins.
(e) Dollies may now be moved separately.
(f) Store pump handle on dolly in position provided.
(g) Store flexible air hose. (Part No. 7400017-502 only)
To couple front and rear trailer dollies, proceed as follows:
(a)
Position front and rear trailer dollies back
to back and set parking brakes on front
trailer dolly.
Place forks of rear dolly on top of forks of
(b)
front dolly.
Align lock in pin holes, insert lock pin in four
(c)
(4) places.
CAUTI0N
Operator will insure that both Fore and
Aft locking pins are installed and secure.
Non-Compliance may result in serious
damage to equipment.
(d)
Raise Mobilizer (refer to para 4.3.1)
(e)
Store pump handle on doll assembly.
(f)
Attach flexible air hose.(Part No. 7000417-502).
Attachment to Shelter
Position rear trailer dolly at door end of the shelter and
front trailer dolly at other end of shelter, then proceed
as follows:
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |