|
|
TM 9- 2990- 205- 34&P
-
-
-
ASSEMBLY AND OPERATIONAL TESTING - CONTINUED
-
0012 00
5. Installation of Oil Deflector, Flinger Sleeve with Metal Seal Rings and Preformed Packing.
a. Install oil deflector (1) and align screw holes.
b. Install three new oil deflector screws (2). Torque screws to 55 to 65 lb--in (6.215 to 7.345 NSm).
1
2
2
03i491m
c.
Install new flinger sleeve (3) with two new metal seal rings (4).
d. Install new preformed packing (5) in bearing housing groove.
3
4
5
03i492m
0012 00- 6
-
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |