|
|
TM 9- 2990- 205- 34&P
-
-
-
ASSEMBLY AND OPERATIONAL TESTING - CONTINUED
-
0012 00
4. Installation of Spacer, Lower Thrust Ring, Thrust Sleeve Bearing, Thrust Bearing, and Upper Thrust Ring.
a. Hold assembled turbine wheel and shaft assembly, turbine backplate, and bearing housing (1) in upright
position (large flange up).
b. Install new spacer (2). Ensure screw holes are properly aligned.
c.
Install new lower thrust ring (3).
d. Install new thrust sleeve bearing (4).
4
3
2
1
03i489m
e. Install new thrust bearing (5). Ensure screw holes are aligned properly.
f.
Install new upper thrust ring (6).
6
5
03i490m
0012 00- 5
-
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |