Click here to make tpub.com your Home Page

Page Title: ASSEMBLY OF SOLENOID RELAY
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

c. Refer to figure 18, step 1 and install gas-
theses refer to figure 17, step 3 except where
ket (G), two nonmetallic washers (F), 0.520 ID,
otherwise indicated.
7/8 OD, 0.031 thick flat washer (E), 1/2-inch
hex nut (D), field coil terminal-to-solenoid relay
a. Install terminal (G) on motor terminal stud
connector (C), 1/2-inch lock washer (B), and
(E) (short stud). Install motor terminal stud,
1/2-inch hex nut (A).
battery terminal stud (F), terminal stud insula-
tion strip (H), and terminal plate (J) with motor
d. Varnish inside of frame and coil assembly.
terminal stud in plate hole marked "MOTOR".
Leave 0.38 inch from each end of frame free of
Install one insulating bushing (K), one insulator
varnish. Allow varnish to dry thoroughly before
(L), one 0.516 ID, 7/8 OD, 1/32 thick flat washer
assembling starter.
(M), two 1/2-inch lock washers (N), one 1/2-
inch, 0.310 thick hex nut (P), and 1/2-inch,
0.438 thick hex nut (Q) on each terminal stud.
31. ASSEMBLY OF SOLENOID RELAY
b. Refer to figure 28 and complete assembly
Note. The key letters shown below in paren-
FIGURE 28. ASSEMBLING SOLENOID RELAY.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business