Click here to make tpub.com your Home Page

Page Title: OPERATIONAL TESTING OF THE STARTER
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9- 2920- 232- 34&P / TO 38X14- 2- 32
-
-
-
- -
OPERATIONAL TESTING OF THE STARTER
THIS WORK PACKAGE COVERS:
Testing
INITIAL SETUP:
Equipment
Equipment Conditions
Test Stand, 500A
Starter completely assembled (need not be fully
Or
sealed) and mounted on test setup
Test bench setup consisting of:
Suitable mount of holder for starter
Carbon pile and fully charged 24V battery or equivalent
power supply
Ammeter, 200A
Voltmeter, 0--50 vdc
RPM indicator, 10,000 rpm suitable interconnect
Testing
1. NO--LOAD Performance Test.
a. Connect starter to power source as shown.
b. Adjust carbon pile (or power supply) to provide 20 volts, as read on voltmeter, while starter is operating.
c.
Current measurement shown on ammeter shall be 95 to 120 amperes, and speed of rotation shall be 5500 to
7500 rpm.
END OF WORK PACKAGE
0011 00-112 0-ank
00-1/ 0bl-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business