|
|
TM 9- 2920- 232- 34&P / TO 38X14- 2- 32
-
-
-
- -
ASSEMBLY OF THE STARTER - CONTINUED
-
0010 00
g. Apply sealing compound around threaded area of plugs (15). Attach each of three field coil leads (16) to its
brush holder (17) using screw (18). Torque to 18--24 lb--in (2.0 to 2.7 Nm).
h. Apply a light coat of grease to gaskets (19). Install two plugs (15) and new gaskets (19) into frame assembly
(12). Torque plugs to 25--30 ft--lb (Nm).
i.
Install one end of electrical lead assembly (20) and washer nut (21) to secure on ground terminal stud (22).
Torque nut to 20--25 lb--ft (27 to 34 Nm) of torque.
NOTE
There are two solenoid assemblies, 1119872 (early) and 1115563 (late).
j.
Install other end of electrical lead assembly (20) and washer nut (23) to G terminal of solenoid assembly (24).
On early model solenoid assembly, remove lower right screw and nut from terminal plate. Install other end of
lead assembly and screw and nut. Torque nut to 16--30 lb--in (1.8 to 3.4 Nm).
(LATE MODEL SHOWN)
0010 00- 14
-
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |