Click here to make tpub.com your Home Page

Page Title: Brush Holder Assembly.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9- 2920- 232- 34&P / TO 38X14- 2- 32
-
-
-
- -
ASSEMBLY OF THE STARTER - CONTINUED
-
0010 00
f.
Position solenoid assembly (2) on frame assembly (12) so that MTR terminal stud (13) engages hole in
bracket (14).
g. Apply sealing compound to threads of four bolts (15) and install to attach solenoid assembly (2) to starter
frame assembly (12). Torque bolts to 95--125 lb--in (10.7 to 14.1 Nm).
h. Install washer nut (16) on MTR terminal stud (13) of solenoid assembly (2) to secure bracket (14) to terminal.
Torque washer nut (16) and washer nut (17), which secures other end of the bracket to field coil terminal to
20--25 lb--ft (27 to 34 Nm).
4. Brush Holder Assembly.
a. Install a new brush spring (1) in brush holder (2), using brush spring wind tool (3) as follows:
1) Back out brush holder attaching screw (4) which is in line with spring (I) and loosen pivot screw (6).
2) Pivot brush holder (2) inward about 30 degrees for tool clearance and tighten pivot screw (6) to hold in
position.
3) Put spring (1) in spring wind tool (3) and hook center of spring in holder (2).
4) Rotate lifter clockwise to wind spring (1) and push spring up into holder (2).
5) Pivot holder (2) back into normal position and torque attaching screws (4) with 18--24 lb--in (2.0 to 2.7
Nm).
0010 00- 6
-

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business