Click here to make tpub.com your Home Page

Page Title: Terminal Plate Assembly.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9- 2920- 232- 34&P / TO 38X14- 2- 32
-
-
-
- -
ASSEMBLY OF THE STARTER - CONTINUED
-
0010 00
2. Terminal Plate Assembly.
a. Align terminal insulators (1 and 2) and terminal plate (3) with bushings (4 and 5) in place on insulator (6).
Install threaded terminals (7) through terminals (8) and through aligned parts. Secure parts together with
washer nuts (9). Torque to 12--15 lb--in (1.4 to 1.7 Nm).
b. Install washer nut (10). Torque to 12--15 Ib--in (1.4 to 1.7 Nm).
c.
Align BAT terminal stud (11) in terminal lug (12) and align MTR terminal (13) so that longer dimensions on
heads are parallel as threaded ends are installed through previously assembled parts.
d. Secure terminals (11 and 13) with flat washers (14), new lock washers (15), and nuts (16). Torque to 15--25
lb--ft (20 to 34 Nm).
e. Install washer nut (17). Tighten finger tight.
0010 00- 4
-

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business