|
|
TM 9-2910-226-34
(9) Refer to figure 3-78. Engage operating shaft
assembly pin (A) in fulcrum lever (B) with torque
link positioned as shown. Rotate torque link upward.
Figure 3-79. Assembling operating shaft spring and plate
(code A pumps}.
Figure 3-78. Engaging operating shaft bearing to fulcrum lever
(code A pumps).
NOTE
Refer to figure 3-75 for selection of operating
shaft bearing and operating shaft spring
plate.
(10) Refer to figure 3-79. Install operating shaft
spring (A) on operating shaft spring plate (B). Refer
to figure 3-80. Install operating shaft spring and
Figure 3-80. Installing operating shaft spring and plate on
plate (A) on operating shaft (B). Make sure the
operating shaft (code A pumps).
spring engages the tang on the operating shaft.
3-53
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |