Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2835-255-34
ACCESSORY GEARBOX REPLACEMENT (Sheet 2 of 3)
REMOVE GEARSHAFT (1) AND
PREFORMED PACKING (2).
5. INSPECT PARTS FOR DAMAGE. REPLACE
AS REQUIRED.
INSTALLATION:
NOTE
If gearbox (3) is new, do steps 1 and 2.
1,
REMOVE ACCESSORY GEARBOX FROM
SHIPPING CONTAINER (PAGE 7-18).
INSTALL DEFECTIVE ACCESSORY
2,
GEARBOX IN SHIPPING CONTAINER
APPLY OIL TO SPLINES (4) OF
3.
GEARSHAFT (1) AND NEW PACKING (2).
INSTALL GEARSHAFT (1) AND PACKING
(2) IN DRIVE SPLINES (5) OF GEARBOX
(3).
4.
APPLY SHORTENING TO FOUR NEW
PACKINGS (6, 7, 8).
5.
INSTALL THREE PACKINGS (6, 7) IN
GEARBOX (3) AND PACKING (8) ON
BOTTOM OF PUMP (9).
ALINE PUMP (9) TO GEARBOX (3).
6.
7,
APPLY OIL TO THREADS AND FACE OF
SCREW (10). INSTALL SCREW (10) AND
WASHER (11). TORQUE SCREW (10)
BETWEEN 70-95 LB-IN (8-11 N-m)
8.
APPLY OIL TO THREADS AND FACES OF
THREE SCREWS (12). INSTALL SCREWS
(12) AND WASHERS (13). TORQUE
SCREWS (12) BETWEEN 20-27 LB-FT
(27-36 N"m).
Go on to Sheet 3
7-22

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business