TM 9-2835-255-34
ACCESSORY GEARBOX REMOVAL AND INSTALLATION IN SHIPPING
CONTAINER (Sheet 2 of 2)
INSTALLATION:
INSTALL TWO BRACKETS (1).
1.
a. Remove six nuts (2) from studs (3).
b. Install brackets (1) on gearbox (4) with
six new nuts (2) and washers (5).
2.
INSTALL AGB MODULE LIFTING SLING
3.
INSTALL GEARBOX (4) IN
4.
WELDMENT (6).
a. Place gearbox (4) over weldment (6) with
oil sump (7) at forward end of
weldment (6).
b. Aline eight holes (8) in brackets (1) with
holes (9) in two mounting bars (10).
c. Set gearbox (4) on bars (10) and install
eight screws (11), washers (12), and new
nuts (13).
TORQUE NUTS (13) BETWEEN 20-24
5.
LB-FT (27-32 N-m).
REMOVE AGB MODULE LIFTING SLING
6.
INSTALL TOP WELDMENT (PAGE 4-3).
7.
End of Task