Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2835-255-34
REDUCTION GEARBOX ASSEMBLY REPLACEMENT (Sheet 3 of 4)
INSTALLATION:
1.
INSTALL DEFLECTOR (1) AND GUIDE PIN (2).
a.
Apply a heavy amount of shortening to splines
(3) and seal (4) of power turbine shaft (5).
Center seal (4) and ring (6) on shaft (5).
b. Align two cutouts (7) and slide deflector (1) in
rear engine (8).
c.
Install pin (2) in hole (9) at 1 o'clock position
in rear engine (8).
NOTE
If gearbox (10) was removed for
access, go to step 3.
2.
REMOVE NEW REDUCTION GEARBOX
ASSEMBLY FROM SHIPPING CONTAINER
3. INSTALL GEARBOX (10).
a.
Turn three screws (11) all the way counter-
clockwise.
b.
Raise gearbox (10) off wood blocks (12) and
align hole (13) with guide pin (2).
c.
Seat gearbox (10) in rear engine (8).
NOTE
Rotate shaft (5) slowly while seating gear-
box (10) to ensure the splines align. Fail-
ure to slowly rotate shaft (5) during instal-
lation may cause damage to ring (6).
Go on to Sheet 4
6-19
Change 6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business