Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2835-255-34
TUBE ASSEMBLY AND INTERNAL PRESSURE SPECIAL SEALS AND
PACKING (NO. 5 AND 6 BEARING OIL FEED) REPLACEMENT (Sheet 2 of 2)
INSTALLATION:
1.
INSTALL TUBE (1), NEW SEALS (2, 3),
AND NEW PACKING (4).
a. Apply shortening to packing (4) and oil to
seals (2, 3). Install packing (4) and seals
(2, 3) on tube (l).
b. Put tube (1) through hole (5) in forward
header (6) and position flange (7) on
power turbine assembly (8). Make sure
packing (4) and seals (2, 3) are seated.
c. Apply antiseize compound to two new
bolts (9). Install bolts (9).
2.
TORQUE BOLTS (9) BETWEEN 45-52 LB-IN
(5-6 N-m).
WAIT 10 MINUTES AND TORQUE BOLTS
3.
(9) BETWEEN 45-52 LB-IN (5-6 N-m).
APPLY ANTISEIZE COMPOUND TO FOUR
4.
BOLTS (10), INSTALL BOLTS (10) AND
WASHERS (11). TORQUE BOLTS (10)
BETWEEN 80-100 LB-IN (9-11 N-m). Wire
six bolts (9, 10).
INSTALL FORWARD ENGINE MODULE
5.
WITH GEARBOX MODULE ATTACHED
End of Task
6-13

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business