|
|
TM 9-2835-255-34
NO. 2 AND 3 BEARING SEAL/PACKING RETAINER REPLACEMENT (INCLUDING INTERSHAFT SEAL)
(Sheet 36 of 49)
CAUTION
Use extreme caution when sliding plain
encased seal (1) over axial compressor
rotor shaft (2). Damage to parts may re-
sult.
17. LUBRICATE PLAIN ENCASED SEAL (1) WITH
LUBRICATING OIL AND INSTALL NO. 2 BEARING
SEAL HOUSING (3) ONTO INTERMEDIATE HOUS-
ING (4). SECURE WITH FOUR BOLTS (5). TIGHTEN
BOLTS (5) BETWEEN 75-95 LB-IN (6-11 N.M)
TORQUE. SAFETY WIRE BOLTS (5).
a.
Lubricate plain encased seal (1) with lubricat-
ing oil.
Align oil transfer tube (6) with hole (7) in bot-
b.
tom of No. 2 bearing seal housing (3).
Carefully lower No. 2 bearing seal housing (3)
C.
over axial compressor rotor shaft (2) and onto
intermediate housing (4). Apply an even
downward pressure to seat No. 2 bearing seal
housing (3) onto intermediate housing (4).
Apply antiseize compound to four bolts (5).
d.
Install bolts (5) and tighten evenly and oppo-
site each other between 70-95 lb in (8-11
N.m) torque. Safety wire bolts (5) using single
wire method.
LE5582
Go on to Sheet 37
5-110
Change 6
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |