Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2835-255-34
NO. 2 AND 3 BEARING SEAL/PACKING RETAINER REPLACEMENT (INCLUDING INTERSHAFT SEAL)
(Sheet 28 of 49)
INSTALLATION:
1.  INSTALL BEARING (1) INTO NO. 3 BEARING
HOUSING (2).
a.
Install spacer (3), with slot (4) in line with
spring pin (5), and tang (6) down, into No. 3
bearing housing (2).
b.
Using marker pencil, place a mark (7) on No.
3 bearing housing (2) relative to position of
spacer tang (6). Remove spacer (3).
c.
Lightly lubricate inner diameter of No. 3 bear-
ing housing (2) with shortening compound.
Install bearing (1) into No. 3 bearing housing
(2) with bearing slot (8) in line with mark (7) on
No. 3 bearing housing (2). Verify bearing
thrust marks (9) are at proper position in No. 3
bearing housing (2).
d.
Using depth gage micrometer, check for prop-
er seating of bearing (1) in No. 3 bearing
housing (2). Measure distance (A) from aft end
of housing (2) to top of outer race of bearing
(1) at three places equally spaced. Measure-
ments at all three locations shall be between
0.748-0.763 inches (18.999-19.380 mm) and
equal to each other.
Go on to Sheet 29
5-102
Change 6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business