|
|
TM 9-2835-255-34
NO. 2 AND 3 BEARING SEAL/PACKING RETAINER REPLACEMENT (INCLUDING INTERSHAFT SEAL)
(Sheet 4 of 49)
d.
Lower aft end (1) onto wood block (2) until
slack in sling cable (3) allows removal of hook
(4) from shackle (5). Remove hook (4).
e.
Attach hook (6) of another hoist to shackle (5)
and take up slack, but do not raise aft end (1)
off wood block (2).
f.
Using sling hoist, slowly raise nose end (7)
while simultaneously lowering aft end (1) to-
ward wood block (8).
g. Position wood block (8) so diffuser liner (9)
and studs (10) clear wood block (8) when aft
end (1) is on wood block (8).
h.
Continue lowering aft end (1) until hoist cables
are slack. Remove hook (6) from shackle (5)
and hook (11) from pin (12).
Go on to Sheet 5
5-78
Change 6
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |