Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2835-255-34
NO. 1 BEARING SEAL/PACKING RETAINER REPLACEMENT (Sheet 10 of 21)
INSTALLATION:
1.  INSTALL NEW PACKING RETAINER (1) IN INLET
HOUSING (2) USING ARBOR PRESS AND IN-
STALLER TOOL (3). CHECK THAT NO GAP EXISTS
BETWEEN PACKING RETAINER (1) AND INLET
HOUSING (2).
Use caution when using arbor press.
Improper tools, or tools not properly
aligned may cause injury to personnel or
damage to parts or equipment.
a.
Place inlet housing (2), with nose facing up,
on arbor press table.
b.
Lubricate packing retainer (1) with lubricating
oil.
Be very careful not to damage new pack-
ing retainer (1) when pressing into inlet
housing (2). Do not jerk press when instal-
ling packing retainer (1).
c.
Using arbor press and installer tool (3) install
new packing retainer (1), with carbon element
side (4) facing up, into inlet housing (2).
d.
Using 0.001 inch (0.025 mm) feeler gage,
check for gap between packing retainer (1)
and inlet housing (2). NO GAP ALLOWED.
e.
If gap is present, remove packing retainer
clean and inspect inlet housing (2) for debris
or burrs. Remove debris or burrs and reinstall
packing retainer (1). Repeat step d.. If prob-
lem persists, replace packing retainer (1) and
repeat step d. again.
Go on to Sheet 11
Change 6
5-63

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business