TM 9-2835-255-34
LOW PRESSURE ROTOR AND HOUSING ASSEMBLY (COMPRESSOR) AND HIGH PRESSURE
AXIAL COMPRESSOR AND ROTOR CLEANING (Sheet 15 of 21)
CAUTION
Be careful not to damage gasket (3) when installing
case and stator assembly (bottom half) (l). If gasket
is damaged, remove case and stator assembly and
repeat steps 25 and 26.
27. INSTALL HIGH PRESSURE CASE AND
STATOR (BOTTOM HALF) (l).
a. Carefully position high pressure case and
stator (bottom half) (1) on engine (2) and
hold in place. Do not damage or move
gasket (3).
b. Apply antiseize compound to 12 bolts (4)
and two bolts (5). Install bolts (4,5) and 14
new nuts (6).
c. Apply antiseize compound to 16 bolts (7),
Install bolts (7) and new lockwashers (8).
d. Apply antiseize compound to 14 bolts (9).
Install bolts (9) and new nuts (10).
28. TORQUE BOLTS (4,5) AND NUTS (6)
BETWEEN 100-110 LB-IN (10-11 N m).
THEN TORQUE BOLTS ( 7 ) B E T W E E N "
100-110 LB-IN (10-11 Nm). TORQUE
BOLTS (9 AND NUTS (10) BETWEEN
68-75  LB-IN  (7-9  Nm)  LAST.
)
NOTE
Gaps larger than 0.001 inch (0.025 mm) at split line
edges are ok if they do not extend into case through
split line.
29. USE FEELER GAGE, AND CHECK GAP AT
SPLIT LINE (11) ON BOTH SIDES OF
HIGH PRESSURE AXIAL COMPRESSOR
(12). THE GAP SHALL BE NO LARGER
THAN 0.001 INCH (0.025 MM). IF GAP IS
GREATER THAN 0.001 INCH, REMOVE
HOUSING, CLEAN SPLIT LINE SURFACE
AND INSTALL HOUSING.
Go on to Sheet 16
5-48 Change 4