|
|
TM 9-2835-255-34
FORWARD ENGINE MODULE (GEARBOX MODULE ATTACHED) REMOVAL
AND INSTALLATION (Sheet 3 of 7)
NOTE
Transfer sling (1) is part of maintenance stand (2).
5. INSTALL SLING (1) TO HOIST HOOK (3)
AND FORWARD MODULE (4).
a. Install shackle (5) in fourth hole (6) from
sling hook (7).
b. Lower hoist hook (3) over forward module
(4) and install sling (1) on hoist hook (3).
c. Install sling hook (7) to shackle (8) of
module sling (9).
d. Remove pin (10) from shackle (11) on
sling (l). Install shackle (11) on ring (12)
of module sling (9).
e. Install shackle (11) on first chain link
(13) and install pin (10).
Go on to Sheet 4
5-27
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |