Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2835-255-34
FORWARD ENGINE MODULE REMOVAL FROM AND INSTALLATION IN
SHIPPING CONTAINER (Sheet 2 of 2)
INSTALLATION:
INSTALL YOKE (1) ON MODULE (2).
1.
Aline yoke (1) on module (2), and loosely
install two screws (3) and new lockwashers
(4),
2.
INSTALL FORWARD ENGINE MODULE
LIFTING SLING (PAGE 5-12).
WARNING
INSTALL MODULE (2) IN WELDMENT (5).
3.
a. Move module (2) over weldment (5). Aline
two holes (6) with pins (7) and lower
module (2) on frame (8).
b. Aline two holes in bottom of module (2)
with two holes (9) in bracket (10). Loosely
install two screws (11) and new
INSTALL SIX SCREWS (13), WASHERS
4.
(14), AND NEW NUTS (15). TORQUE
SCREWS (13) AND NUTS (15) BETWEEN
52-60 LB-FT (71-81 Nm).
TIGHTEN SCREWS (11).
5.
TORQUE SCREWS (3) BETWEEN 39-43
6.
LB-FT (53-58 Nm).
7.
REMOVE FORWARD ENGINE MODULE
LIFTING SLING (PAGE 5-12).
INSTALL TOP WELDMENT (PAGE 4-3).
8.
End of Task
5-24

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business