Click here to make tpub.com your Home Page

Page Title: FORWARD ENGINE MODULE LIFTING SLING INSTALLATION AND REMOVAL (Sheet 1 of 1)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2835-255-34
FORWARD ENGINE MODULE LIFTING SLING INSTALLATION AND
REMOVAL (Sheet 1 of 1)
TOOLS: Hoist, 1000-pound minimum capacity (Item 11, Appendix D)
Lifting sling (Item 7, Appendix D)
PERSONNEL: TWO
INSTALLATION:
1. POSITION SHACKLE (1) AND HOOK
SLING (2) TO HOIST HOOK (3).
NOTE
If moving forward module (4), do steps a and c. If
moving forward module (4) with gearbox module (5),
do steps b and c.
a. Install shackle (1) in second hole (6) from
short cable (7).
b. Install shackle (1) in fourth hole (8) from
short cable (7).
c. Hook sling (2) to hoist hook (3).
2. INSTALL SLING (2).
a. Aline sling (2) with module (4).
b. Remove pin (9) from shackle (10). Aline
shackle (10) with block (11) and install
pin (9).
c. Install hook (12) on pin (13) and take
slack out of sling (2).
REMOVAL:
REMOVE SLING (2).
a. Lower sling (2) until cables (7, 14) are
slack.
b. Remove hook (12) from pin (13).
c. Remove pin (9) from shackle (10). Remove
shackle (10) and install pin (9) in
shackle (10).
d. Remove sling (2) from hoist hook (3).
End of Task
5-12

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business