|
|
TM 9-2835-255-34
TURBINE AXIAL COMPRESSOR (HIGH PRESSURE) HOUSING (Top HALF)
REPLACEMENT (Sheet 5 of 5)
INSTALL TWO COVERS (1). CONNECT
5.
STUD (2), LINK (3), AND SENSOR (4).
a. Apply antiseize compound to four bolts
(5). Position covers (1) and new gaskets
(6) on housing (7). Install two bolts (5) in
each cover (1).
b. Position stud (2) in lever (8). Install pin
(9) through lever (8) and stud (2). Install
washer (10). Install new cotter pin (11).
c. Position link (3) on eye bracket (12).
Install pin (13) and lockpin (14).
d Install connector (15) on sensor (4). Place
lead (16) on link (3) and install tiedown
strap (17).
INSTALL IGNITION ELECTRICAL LEAD (TM 20-1).
6.
7.
INSTALL TUBE ASSEMBLY (ELECTRO-MECHANICAL FUEL SYSTEM TO FUEL NOZZLE)
(TM 20-1).
[NSTALL COMPRESSED AIR TUBE ASSEMBLY (TM 20-1).
8.
9.
[NSTALL INLET GUIDE VANE FEEDBACK CONTROL ASSEMBLY (TM 20-1).
10. INSTALL TUBE ASSEMBLY (NO. 2 AND 3 BEARING FEED) (TM 20-1).
11. INSTALL TUBE ASSEMBLY (NO. 2 AND 3 BEARINGS) (TM 20-1).
12, INSTALL TUBE ASSEMBLY (NO. 5 AND 6 BEARINGS) (TM 20-1).
13, INSTALL TUBE ASSEMBLY (FORWARD REDUCTION GEARBOX) (TM 20-1).
14, INSTALL TUBE ASSEMBLY (BOTTOM OF INLET GUIDE VANE ACTUATING CYLINDER)
(TM 20-1).
15. INSTALL TUBE ASSEMBLY (TOP OF INLET GUIDE VANE ACTUATING CYLINDER)
(TM 20-1).
16. INSTALL TRANSMISSION PRESSURE VELOCITY MODULATOR TUBE ASSEMBLY (TM 20-1).
17. INSTALL PRESSURE FLUID FILTER DOUBLE ANGLE BRACKET (TM 20-1).
18. INSTALL ENGINE STARTER MOTOR (TM 20-1).
19. PERFORM INLET GUIDE VANE/POWER TURBINE STATOR (IGV/PTS) ADJUSTMENTS
(TM 20-1).
End of Task
5-5
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |