|
|
TM 9-2815-224-34&P
Valve Mechanism Maintenance Instructions (Cont)
7-30 VALVE GUIDE REMOVAL/lNSTALLATION.
This task covers:
c. Follow-on Maintenance
a. Removal
b. Installation
INITIAL SETUP
Equipment Condition
Models
All
Condition Description
TM or Para
Engine brake retarder
Test Equipment
removed.
None
Rocker arms removed.
Special Tools
Exhaust valve bridges
removed.
Remover, valve guide J6569
Fuel injectors removed.
Installer, valve guide J2 1520
Exhaust valves removed.
Supplies
Cam followers and push rods
Oil, lubricating, Item 48, Appendix C
removed.
Brush, bore, Item 9, Appendix C
Special Environmental Conditions
Personnel Required
None
MOS 63W, Wheel vehicle repairer
General Safety Instructions
References
None
None
Level of Maintenance
Direct Support
a. Removal.
TA357659
NOTE
There are 16 valve guides on cylinder heads. Repeat steps (1) through (3) for
removal of each valve guide.
(1) Clean valve guide (1) using bore brush.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |