|
|
*TM 9-2815-213-34
(1) Immerse the filter element in carbon
b. Assembly oil cooler. Plug oil outlet and attach
tetrachloride to trichloethylene,
or other approved
cleaning solvent.
70/100 p.s.i. air line to oil inlet.
c. Immerse unit in water and apply air pressure.
(2) Using a rubber suction cup force solvent
around and through the tubes until clean.
The slightest leak will be indicated by the appearance of
air bubbles.
d. Assemble front and rear heads to cooler.
NOTE
e. Plug either inlet or outlet connection and check
If all passages are badly clogged,
for leaks as described in steps (1) and (2) above.
circulate an oakite or alkaline solution
through the tubes.
3-160. Repair
a. Header leaks may occur where tubes protrude
(3)
After cleaning flush thoroughly with hot
through header plate or where header is soldered. The
water.
header may become cracked in service due to excessive
b. Water Side.
pressure. Resolder tubes to header as necessary.
(1) Plug oil inlet and outlet.
CAUTION
(2) Immerse oil cooler in solution of one part
Do not burn tubes or header material with torch flame.
muriatic acid, nine parts water, one pound oxalic acid,
b. Perform general repairs in accordance with
and 0.01 gallon of pyridene to each five gallons of acid.
(3) Remove core when foaming and bubbling
3-161. Assembly
stops. This usually takes 30 to 60 seconds.
Assemble cooler in reverse order of disassembly (para
(4) Immerse unit in a 5 percent solution sodium
carbonate. Remove when bubbling stops and pressure
flush with clean warm water.
CAUTION
(5) Clean' inside of case thoroughly will steam
Insure element is assembled so "O"
or solvent.
marks are aligned on case and element.
3-159. Inspection
a. Perform general inspection in accordant with
Section XXX. REPAIR OF EXHAUST MANIFOLDS
3-162. Cleaning
3-164. Installation (right bank)
Clean manifolds in accordance with instructions in
Secure manifold to head with eight cap screws, spacers,
four lockplates, and four gaskets.
3-163. Inspection
Inspect manifolds in accordance with instructions in
Section XXXI. ENGINE REMOVAL FROM REBUILD STAND
with 12 cap screws and lockwashers.
3-165. General
d. Install oil cooler and four gaskets securing with
Attach lifting hooks to hoist to front and rear engine lifting
13 cap screws and lockwashers to block and cover plate.
e. Install left bank manifold and four gaskets to
3-166. Rebuild Stand Removal
cylinder head securing with eight cap screws, spacers,
a. Remove cap screws and lockwasher securing
and four lockplates.
engine stand and adapter plate to engine block.
b. Remove stand and adapter from engine. c.
Install gasket and left side cover plate to block securing
Section XXXII. ENGINE TEST AND ADJUSTMENT
reaching operating temperature.
3-167. Adjustment
(2) Always adjust injectors before crossheads and
a. Injectors, Crossheads, and Valves.
valves.
(1) Injector plungers, crossheads and valve
must be adjusted before starting engine first time at cold
setting and-again during engine test after
3-57
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |