Section Ill. SHOP LAYOUT
The subassemblies are then routed to the various
2-7. General
overhaul stations for disassembly, cleaning,
This section discusses the purpose and
inspection, r e p a i r a n d reassembly.
The
m a i n t e n a n c e policy pertaining to depot main-
overhauled assemblies are returned to the main
tenance prescribed in this manual for produc-
assembly l i n e f o r b a s i c e n g i n e a s s e m b l y .
tion-line overhaul or rebuild of the engine.
Overhauled accessories are installed on the basic
2-8. Shop Layout
engine, a n d t h e e n g i n e i s subjected to a
dynamometer acceptance test.
by-station production line setup for overhaul or
b. In actual practice, specific shop layouts will
rebuild of the engine. The engine is steam
vary according to the physical facilities available
cleaned and engine oil is drained. The engine
and the quantity of engines to be overhauled.
accessories are removed and routed to their
Planning for a depot overhaul program must he
respective rebuild stations. The basic engine
sufficiently flexible to allow for variations in the
moves along the assembly line through the
condition of the materiel received for processing.
various stages of disassembly into subassemblies.
2-7
|