Click here to make tpub.com your Home Page

Page Title: Section III. SHOP LAYOUT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Section Ill. SHOP LAYOUT
The subassemblies are then routed to the various
2-7. General
overhaul stations for disassembly, cleaning,
This section discusses the purpose and
inspection,  r e p a i r a n d  reassembly.
The
m a i n t e n a n c e policy pertaining to depot main-
overhauled assemblies are returned to the main
tenance prescribed in this manual for produc-
assembly  l i n e f o r b a s i c e n g i n e a s s e m b l y .
tion-line overhaul or rebuild of the engine.
Overhauled accessories are installed on the basic
2-8. Shop Layout
engine,  a n d t h e e n g i n e i s  subjected  to  a
a. The layout (fig. 2-4) shows a typical station-
dynamometer acceptance test.
by-station production line setup for overhaul or
b. In actual practice, specific shop layouts will
rebuild of the engine. The engine is steam
vary according to the physical facilities available
cleaned and engine oil is drained. The engine
and the quantity of engines to be overhauled.
accessories are removed and routed to their
Planning for a depot overhaul program must he
respective rebuild stations. The basic engine
sufficiently flexible to allow for variations in the
moves along the assembly line through the
condition of the materiel received for processing.
various stages of disassembly into subassemblies.
Figure 2-4. Typical shop layout.
2-7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business