|
|
TM 9-2520-270-34
17. LOCK INSERT (3) IN PLACE.
16. PREPARE OVERSIZE INSERT SWAGE
a. Put swage tool (1) into insert (3).
TOOL (1).
b. Using hammer, strike top of swage
a. See task for proper oversize insert
tool (1) until swage tool stop (2)
swage tool (1).
bottoms on housing (4). Remove tool.
b. See task for proper swage tool stop (2).
c. Inspect new insert (3) for damage
during installation. If damaged, go to
c. Install swage tool stop (2) on
step 1. If not, go to step 20.
swage tool (1).
19. LOCK INSERT (7) IN PLACE.
a.
Put swage tool (5) into insert (7).
b.
Using hammer, strike top of swage
tool (5) until swage tool stop (6)
18. PREPARE STANDARD INSERT
bottoms on housing (8). Remove tool.
SWAGE TOOL (5).
c.
Inspect new insert (7) for damage
a.
See task for proper standard insert
during installation. If damaged, go to
swage tool (5).
step 1.
20. CLEAN ALL NEW INSERTS AND
See task for proper swage tool
b.
R E L A T E D HOUSING.
stop (6).
c.
Install swage tool stop (6) on swage
a. Clean assembly and hardware. See
tool (5).
END OF SUBTASK
2-175
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |