|
|
TM 55-8145-203-13&P
(19) At top and bottom of door, trim the ends of the
1
seal (1) so they are flush with the inside edge
of the door.
(20) Stretch the rectangular seal (1) around the
right-hand door (2). Make sure the large curved
lip of the seal is on the outside portion of the
door.
(21) Pull the seal (1) away from the bottom edge of
the door (2) allowing access to the inside edge
of the seal.
NOTE
Installation of the carriers must be complete
before polyurethane is allowed to dry.
(22) Starting from about eight inches above the
inside bottom edge of the door, apply a 1/8
OUTSIDE OF DOOR
inch bead of polyurethane sealant (3) (Item 2,
facing the edge of the door. Continue the
application to the other side of the seal and up
2
the edge for about another eight inches.
(23) Install the seal around the bottom edge of the
1
door.
(24) Position the appropriate long carrier along the
outside edge of the right-hand door.
3
(25) Repeat Steps (13) and (14) for the long carrier.
(26) Position the appropriate long carrier along the
inside edge of the right-hand door.
8 INCHES
(27) Repeat Steps (13) and (14) for the long carrier.
(28) Position the appropriate short carrier along the
top edge of the door.
(29) Repeat Steps (13) and (14) for the short carrier.
2
(30) Position the last short carrier along the bottom
edge of the right-hand door.
1
(31) Repeat Steps (13) and (14) for the short carrier.
Chahang1 1 5-8.1
C nge e
13
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |