4920-01-139-4534">

 

Click here to make tpub.com your Home Page

Page Title: SECTION III. PRINCIPLES OF OPERATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-4920-439-13&P
SECTION III. PRINCIPLES OF OPERATION
1-8. After the shelter has been erected, the operator personnel will unbolt selected items of equipment. These items will
be relocated to preselected positions on the expanded side of the shelter. (See para. 1-7c. and d.). The selected items,
when moved, will not be secured, (bolted) in place. This allows the shop personnel a certain flexibility in the event long or
bulky materiel must be repaired within the shelter. The recommended locations were selected for proper utilization of
floor space and maximum safety for the operating personnel
WARNING
Four people are needed when moving or lifting the Environmental Control Units
(ECUs). Each unit weighs approximately 270 pounds. Trying to move or lift an
ECU without help can cause serious injury to personnel.
1-9. The two ECUs are positioned on special fold down shelves, when the shop is in the operational mode. Power is
provided by a 208V cable located inside the shelter next to each shelf. Both ECUs can be easily removed for service or
repair.
1-10.  Detailed instructions for unbolting equipment and the recommended sequence for relocation is contained in
Chapter 2, Section II. The procedures for striking the shelter and preparing the Electric/Instrument Shop for transport or
storage are contained in Chapter 2, Section III.
1-11.  Electrical power to operate the Electric/Instrument Shop is provided by an auxiliary generator or a commercial
power source. A power distribution panel (PDP) is used between the power source and the power entry panel of the
shelter. Overload protection is by circuit breaker. The circuit breaker panel is located inside the shelter next to the
personnel entrance door.
Change 1 1-5/(1-6 blank)