|
|
TM 55-4920-437-13&P
b. Install cable (3) and retainer block (2) with
screws (1).
NOTE
When floor is lowered, (to allow roof
clearance for folding) the devices
securing
fold-out
floor
counterbalance
cables
can
be
disengaged.
WARNING
When all equipment and materiel is stored on the stationary side of the shelter, the
limited floor space presents a safety hazard to operating personnel. This is most
critical during the raising and lowering of the roof panel. Failure to observe
supplemental instructions could result in serious injury to personnel. Personnel
inside the shelter could become trapped between the roof panel and equipment
bolted to the floor.
2-32 Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |