|
|
TM 55-4920-437-13&P
5. Position top bar (6) and install two bolts (2)
with washers (12).
6. Close other ECU shelf and secure latches
as in step 4.
7. Insert four plugs (13) in each ECU shelf.
CAUTION
Two vises, mounted on the bin storage cabinets, must be positioned so that
handles are located toward narrow sides of cabinets. If handles are pointed in
direction of movable side of shelter, they will restrict dosing of the end wall and
could result in damage to the wall.
Storage procedures.
In the event the
2-12.
Propeller/Rotor Shop is to be placed in storage the
provisions of TM 740-90-1, TM 743-200-1 and applicable
shop equipment TM's will be followed.
2-13. Striking the shelter. Procedures for striking the
shelter are contained in TM 10-5411-201-14.
In
addition, the following "Supplemental Instructions" will be
observed.
a. Remove screws (1) at both corners of fold-out
floor.
Change 1 2-31
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |