|
|
TM 55-4920-325-14&P
Table 3-1. Inspection Requirements.
Major Assembly
Item
Item, or Area
Requirement
Each Operation Inspection
Test set front panel.
Operate switches and
Controls
controls. Perform-
ance should be
smooth and positive.
Detents should hold
switches firmly in
selected position.
Test set front panel
Check that power
Indicator Lamp
indicator lamp
lights when Power
ON/OFF switch (2,
figure 2-1) is set to
ON.
Inspect connectors for
Test set front panel and
Electrical Con-
bent pins, damaged
accessory cables.
nectors and
shells, worn or
Cable Assem-
frayed wiring.
blies
Test set front panel.
Check for cracked or
Indicators
shattered glass.
Daily Inspection
Inspect for loose or
Test set, general.
Hardware
missing hardware.
Test set front panel.
Check that proper
Fuses
fuse is installed in
fuse holder.
Intermediate Inspection
Check for dented or
Test set exterior.
Transit Case
sprung cover on
case.
Periodic Inspection
Check for grease,
Test set and cable assemblies,
Test Set
dirt, dust, or
grime.
3-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |