Click here to make tpub.com your Home Page

Page Title: MC CAULEY PROPELLERS.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-4920-201-14
h. Hoist entire assembly approximately 1/4 inch
off work stand. Check to insure that the suspended
1. 7A050 Kit storage case
assembly is free from interference with work stand
(bottom half)
and other objects, and note balance condition
2. Auxiliary support blocks
indicated by the black indicator disc at the top end
3. Propeller assembly
of the arbor.
4. Balancing arbor
i. For balance tolerance and application of
5. Weight assembly
balance corrections, refer to applicable propeller
6. Hydraulic hoist
manual. (Refer to appendix A.)
7. Quick-disconnect coupling
and suspension cable
8. Adjustable weight
9. Work stand
4-23. MC CAULEY PROPELLERS.
4-24. Model lA200, and One Piece Fixed Pitch.
a. Center plate (1) on stand table assembly (1,
b. Center propeller assembly (2, figure 4-13),
with camber (curved surface of the blade)
downward on plate (1).
NOTE
The blade face is the blade surface adjacent
to the aircraft; the flat side of the blade
that can be seen by standing behind the
aircraft. The blade back (camber) is the
curved surface of the blade that can be seen
by standing in front of the aircraft.
c. Install bushing (3), knurled hub upward, on
balancing arbor (5) so that top surface of bushing
aligns with the 14-inch position on arbor scale
(6). Secure bushing in this position by tightening
bushing set screw (4) with 1/8 inch-hex wrench (8,
Key to figure 4-13 :
1. Plate (2209, 7A050 kit)
d. Install arbor downward through propeller
2. Propeller assembly
hub and plate (1), seating pilot diameter of bushing
3. Rear bushing (2210, 7A050
(3) firmly into center bore of propeller hub.
kit)
e. Install spacers (7), as shown in figure 4-13
4. Bushing setscrew
over lower end of arbor. Hold spacers in place.
5. Arbor (2259, 7A050 kit)
f. Install hand wheel (8) in bottom end of
6. Arbor scale
arbor, and tighten wheel to clamp parts securely
7. Spacers (2201, 2202, 2203,
together.
2204, 7A050 kit)
g. Install suspension cable (13, figure l-13)
8. Handwheel (2215, 7A050
and quick-disconnect coupling (10, figure l-13)
kit)
assembly on suspension rod at top end of arbor, and
Figure 4-13. Typical Balancer Installation -
engage suspension cable in lifting plate of hydraulic
Fixed Pitch, Flange-mounted Propellers.
pump.
4-20 Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business