TM 55-2350-272-14
Figure 5-6. End elevation, tiedown of the M973 on the M172A1 semitrailer.
Table 5-3. Bill of Materials for Blocking and Tiedown of the M973 on the M172A1 Semitrailer (Figs 5-5, 5-6, and 5-7).
Approximate
Item
Description
Quantity
Lumber
Douglas-fir or comparable, straight-grain, free from material defects;
Fed Spec MM-L-71:
2- x 4-inch
2 linear ft
2- x 6-inch
100 linear ft
2- x 10-inch
40 linear ft
Common, steel; fiathead, bright or cement-coated, type II, style 10;
Fed Spec FF-N-106: 12d
270
20d
100
Wire rope*
6 x 19 IWRC; improved plow steel; preformed, regular-lay; table X,
Fed Spec RR-W410: inch
160 ft
Clamps*
Wire rope, U-bolt clips, saddled, single-grip, forged steel, Crosby heavy-duty
or equal; Fed Spec FF-C450: -inch
20
*Chains and loadbinders may be substituted.