Click here to make tpub.com your Home Page

Page Title: VALVE, PRESSURE RELIEF.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1930-208-24
3-54. PUMP, TRANSFER - Continued.
f. Installation - Continued.
(2) Secure pump (6) to base with four screws (5) and four nuts (4).
(3) Install two gaskets (3) and two flanges (2) and secure with sixteen screws (1).
(4) Install shaft assembly per paragraph 3-53.
(5) Install pressure relief valve per paragraph 3-55.
3-55. VALVE, PRESSURE RELIEF.
This task covers:
a. Removal
b. Disassembly
c.
Cleaning and Inspection
d. Repair
e. Reassembly
f.
Installation
INITIAL SET-UP:
Tools Required:
Tool Kit, General Mechanic's (Item 1, Appendix B)
Materials Required:
Gasket P/N 536606
Gasket P/N 536652
Solvent, Cleaning (Item 4, Appendix C)
Equipment Conditions:
Engine shut down (paragraph 2-11, TM 55-1930-208-10).
a. Removal. (Refer to figure 3-113).
(1) Remove twelve screws (1) securing relief valve (2) to transfer pump.
3-192

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business