Click here to make tpub.com your Home Page

Page Title: GEAR TRAIN AND IDLER GEAR.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1930-208-24
3-43. GEAR TRAIN AND IDLER GEAR.
This task covers:
a. Removal
b. Cleaning
c. Inspection
d. Installation
INITIAL SETUP:
Tools Required:
Tool Kit, General Mechanic's (Item 1, Appendix B)
Wrench, Torque (Item 71, Appendix B)
Materials Required:
Oil, Fuel (Item 9, Appendix C)
Equipment Conditions:
Engine shut down (paragraph 2-11, TM 55-1930-208-10).
Flywheel housing removed (paragraph 3-45).
a.
Removal. (Refer to figure 3-90). Remove bolt (1), washer (2), and gear (3).
Figure 3-90. Gear Train Idler Gear, Removal/Installation.
b.
Cleaning.
(1)
Clean all parts in clean fuel oil (item 9, Appendix C).
(2)
Wipe off excess oil and dry.
c.
Inspection.
(1)
Inspect bearings and cups for wear, pitting, scoring, or flat spots.
(2)
Inspect gear for scoring, pitting, cracking, chipping, and wear.
3-151

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business